Skip to content
English - United States
  • There are no suggestions because the search field is empty.

How to Set Dashboard Reports to Portrait

Complete guide to formatting dashboard reports for construction project management

Dashboard report formatting ensures your project data displays clearly when printed or shared as PDFs. Use this process when you need to create professional reports for stakeholders, job site meetings, or project documentation.

Before you start

  • Ensure your dashboard contains the data you want to include in the report.
  • Check that all dashboard tiles display the correct information.

Switch the report to portrait

Open Dashboard Settings

  1. Open your dashboard and locate the Action button in the top-right corner.
  2. Click Settings from the dropdown menu.

Animation showing the dashboard toolbar with zoom controls, the Drag & Resize menu and the three-dot Action button

Set the print orientation

  1. Select Portrait from the Print Orientation dropdown to switch the report layout from landscape.
  2. Close the Dashboard Settings modal (click Done or the X button; either way, the change is saved automatically).
  3. Wait for the dashboard elements to rearrange automatically.

Dashboard Settings dialog with Print Orientation set to Portrait

Your dashboard adjusts to portrait format, with tiles repositioned for optimal vertical layout.

Note: All dashboard changes are saved automatically. You don't need to manually save after changing the orientation. Each autosave creates a version entry in Version History.

Preview your report

  1. Click Print Preview to review the formatted layout.
  2. Check that all tiles fit properly within the portrait boundaries.
  3. Use the Drag & Resize feature to adjust any tiles that appear cramped or misaligned.
  4. Verify that critical data remains visible and readable.

Animation showing a dashboard report preview with stadium image, map, budget tiles, summaries and project phases

Share your dashboard

  1. Click the Share button in the top-right corner.
  2. Select one of the options below.
OptionWhat it does
Share LinkGenerates a shareable link (see How to Share a Dashboard Link for details)
Download PDFExports your dashboard as a PDF file

Your dashboard report downloads as a professional PDF in portrait format, ready for printing or sharing with project stakeholders.

Dashboard toolbar with the Share menu open showing Share Link and Download PDF options

Tip: Structure your dashboard content before changing orientation. Portrait format works best with vertically stacked charts and data tables rather than wide horizontal layouts. Download a sample report first to check print quality before creating final reports for important meetings.

Troubleshooting and FAQs

QuestionAnswer
Can I revert to the previous layout if I don't like the portrait arrangement?Yes. Use the Version History button (beside the Share button) to preview and restore an earlier version of your dashboard.
What happens to wide tiles that don't fit the portrait layout?Wide tiles are automatically resized to fit within the portrait boundaries. If any tiles appear cramped, you can fine-tune their size and position in Print Preview.
Can I set portrait as the default orientation for all dashboards?No. Print orientation is set per dashboard. You need to change it individually for each dashboard you want in portrait format.

Need help?

Contact Mastt Support for additional assistance with dashboard report formatting.