How to Customize Brand Colors for Letters

Complete guide to setting brand colors for change order and payment letters in construction project management

Customize the color scheme of all your change order letters and payment letters so they match your brand. You can set brand colors at the Workspace level (applies to all projects) or the Project level (for individual projects).

Before you start

  • Workspace level branding requires Workspace Admin permissions.
  • Project level branding requires Project Admin permissions or higher.
  • Have your brand hex codes ready if you want exact color matching.
  • Workspace level colors apply to all existing and new projects unless overridden at the project level.

Choose a level

Level Applies to Best for
Workspace level All projects in the workspace that use the default The most efficient way to keep branding consistent across all your projects
Project level One project only A project that needs different colors from your workspace default, for example when a client has their own brand guidelines

Set brand colors at workspace level

Open workspace branding settings

  1. From the homepage, click your name in the top right corner.
  2. Select Admin from the dropdown menu.
  3. Click Workspace Details in the left navigation sidebar.
  4. Scroll down to the Branding section.
  5. Click Set Workspace Brand Preset.

The Brand Colors modal opens with preset options and fine-tune controls.

Workspace Details page with Workspace Details in the sidebar and the Edit Workspace Brand Preset button highlighted

Warning: Setting a workspace preset applies the branding to all existing projects that use the workspace default. Projects with their own branding keep it. Make sure this is what you want before saving.

Apply a preset or fine-tune colors

To use a preset:

  1. At the top of the modal, find the Preset section with several color options.
  2. Click any preset to select it.
  3. Check the preview on the right, which updates immediately to show how your letters will look.

Animation showing the workspace Customise Branding dialog, where selecting the Tangerine preset turns the letter preview orange

To fine-tune individual colors, scroll down to the Fine-Tune section:

  1. Click the color square to open the color picker, or type a hex code directly into the text field.
  2. Adjust individual color settings as needed (Totals, Subtotals, Table Headers, Backgrounds, Highlights and Labels).

Tip: If you have specific brand guidelines with hex codes, typing them directly ensures exact color matching.

Fine Tune section listing hex colour values for Totals, Sub-Totals, Table Headers, Backgrounds, Highlights and Labels

Save your workspace brand colors

  1. Review the preview to confirm your colors look correct.
  2. Click the blue Save Colors button.

Your workspace brand colors are now saved and will apply to all change order letters and payment letters across all projects in this workspace.

Set brand colors at project level

Use project level branding when a specific project needs different colors from your workspace default.

Open project branding settings

  1. Navigate to your project and open the Project Dashboard.
  2. Click the Settings button (cog icon) at the bottom of the left navigation sidebar.
  3. In the Project Settings modal, click the Brand tab in the left menu.
  4. Scroll down and click Customize Brand Colors.

Project settings Brand tab with the Brand tab and Customise Branding button highlighted

Note: If you see Using workspace default, the project is currently using workspace level brand colors. Hover over the information icon to see more details about inheritance settings.

Apply a project-specific preset or fine-tune colors

Tip: Selecting a preset or making any color changes at the project level overrides the workspace default for this specific project only.

To use a preset:

  1. At the top of the modal, find the Preset section. The first preset is labeled Workspace Default, which is the inherited workspace brand.
  2. Click any other preset to apply project-specific branding.
  3. Check the preview, which updates to show how your project letters will look.

Animation showing the Customise Branding dialog, where selecting the Lemon Lime preset turns the letter preview green

To fine-tune individual colors:

  1. Scroll down to the Fine-Tune section.
  2. Click the color square to open the color picker, or type a hex code directly into the text field.

Tip: If your client has specific brand guidelines, use their exact hex codes to ensure change order and payment letters match their corporate identity.

Save your project brand colors

  1. Review the preview to confirm your colors look correct.
  2. Click the blue Done button to close the brand colors modal.
  3. Click Save on the Project Settings modal to save all project settings.

Your project level brand colors are now saved and will apply to all change order letters and payment letters generated from this project. To change the font, or the font and size of numbers, in payment letters, use the Customize Branding options on the same Brand tab.

Troubleshooting and FAQs

Will workspace brand colors affect projects that already have custom branding?

No. Projects with custom brand colors keep their project-specific settings. Workspace colors only apply to projects using the default.

How do I reset a project to use workspace brand colors?

Open the project's Brand settings and select the Workspace Default preset at the beginning of the preset options. This reverts the project to inherit workspace level branding.

Need help?

Contact Mastt Support for additional assistance with brand customization.