How to Edit and Delete Contracts
Manage contract details, line items, and sections in your construction project
Update contract details, line items and sections, or delete a contract you no longer need.
Before you start
- You need appropriate project permissions to edit or delete contracts.
- Contracts linked to payments or variations can't be deleted until those dependencies are removed.
Edit a contract
Open the contract form
- Click Cost in the left-hand navigation bar.
- Open the contract form using one of these methods:
- From the Overall page: Locate the contract, click the Action button, and select Edit Contract.
- From the Contracts tab: Click Contracts in the top navigation, find the contract in the register, click the Action button, and select Edit Contract.

Update contract details
- Click into the Title field to update the contract name.
- Modify the contract status, dates, and other fields as needed. Only approved contracts can be selected when you add a payment, so check the contract status if it is missing from the payment form.
- Select the correct Contract Standard from the dropdown menu. The Contract Standard determines the fields available on the contract and the document templates it uses, so check it is correct before you save.
- Click the Roles tab and turn on the authorising toggle for the role that should appear as Authorised by on letters. The toggle's name depends on the Contract Standard.

Manage line items
The Line Items tab shows all contract line items with their name, value, budget assignment, status, due date, and tax rate.
Edit an existing line item
- Click into any field (name, value, date, Tax %) to edit it directly in the table.
- Click the Budget dropdown to reassign a line item to a different budget.
Add a line item
- Click Add Line Item at the bottom of the form.
- Fill in the line item details, including amount, tax rate, and budget.
Remove a line item
Click the Trash icon on the right side of the row. You can't delete line items linked to variations or payments. If the trash icon is greyed out, the line item has variations or payments linked to it. Reassign the variation lines to another contract line item, or delete the linked payments first and then the variations.

Manage contract sections
For contracts with sections or separable portions:
- Click Add Section below the contract line item details.
- Name each section based on your contract portion.
- Add line items to sections by clicking the + icon next to the section name, or drag existing line items into sections using the grab handle icon (six dots) on the left side.

Add notes and supporting documents
- In the Notes section, add internal comments explaining your changes. These are not shared externally and create an audit trail.
- In the Attached Files section, click inside the box or drag and drop files to attach supporting documents.
- Click any uploaded file to open the Documents preview panel, a side panel to the right of the form that displays the full document.
In the preview panel you can:
| Control | What it does |
|---|---|
| Download | Save a copy |
| Zoom controls (-/+) and page navigation | Browse through multi-page documents |

Save your changes
- Click the blue Update button in the bottom right corner. A confirmation message appears, and your changes show in the project straight away.
Delete a contract
Warning: Deletion is permanent and cannot be undone. You cannot delete contracts linked to payments or variations. Remove all associated records first.
- Click Contracts in the top navigation to open the Contracts register.
- Find the contract you want to delete.
- Click the Action button next to the contract.
- Select Delete Contract from the dropdown menu.
- Confirm by clicking the red Delete button in the confirmation pop-up.

Troubleshooting and FAQs
Why can't I delete a line item or contract?
The item is linked to existing variations or payments. For a line item, you can reassign its variation lines to another contract line item instead of deleting them. Otherwise, delete the linked payments first and then the variations (a variation with payments can't be deleted), then retry the deletion.
Can I undo a contract deletion?
No. Deletion is permanent. If you accidentally delete a contract, you will need to recreate it manually.
Need help?
Contact Mastt Support for additional assistance with contract management.